Q&A · ESMA
Settlement location
In RTS 2 transparency reference data, the delivery or cash settlement location of electricity and gas contracts should be reported with the same Energy Identification Code whether the contract is cash or physically settled; where no EIC fits, a 16-character ad hoc code identifying the contract's reference must be used (ESMA lists some), never generic values such as 'CASH'.
Details
| Reference | ESMA_QA_751 |
|---|---|
| Issuer | ESMA |
| Published | 31 Mar 2023 |
| Answered | 31 Mar 2023 |
| Submitted | 31 Mar 2023 |
| ESMA topics | Transaction reporting |
Provisions it relates to
- MiFIR (whole act)Explicit reference
Documents it refers to
- RTSIn forceExplicit reference
AI summaryRTS 2 on transparency for bonds, structured finance products, emission allowances and derivatives: sets pre-trade transparency by trading system type, large-in-scale and size-specific-to-the-instrument thresholds, order management facility sizes, the liquidity assessment of each instrument class, and post-trade publication content and deferral regimes. Amended several times, notably by Delegated Regulations 2021/529, 2022/629, 2023/945 and 2025/1246.